Dachaigh › Cairtean uaine › United Concrete of Montana, LLC
United Concrete of Montana, LLC: sponsorachadh cairt uaine (PERM)
Chuir United Concrete of Montana, LLC 4 iarrtasan dearbhaidh obrach PERM a chaidh a dhearbhadh ann am bliadhnaichean ionmhais 2024–2026; dearbhte: 3. Tuarastal meadhanach tairgte $53,934; ùine mheadhanach bhon chur-a-steach chun dearbhadh: 403 làithean.
Tiotalan dreuchd
| Tiotal dreuchd | Iarrtasan PERM | Tuarastal meadhanach |
|---|---|---|
| Lead Flatwork Concrete Finisher (Multiple Positions) | 2 | $53,934 |
| Lead Structural Concrete Form Setter (Multiple positions) | 2 | $53,934 |
Làraich obrach
Gnìomhan
Co-dhùnaidhean as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Air a cho-dhùnadh | Inbhe | Làithean |
|---|---|---|---|---|---|---|
| Lead Structural Concrete Form Setter (Multiple positions) | $53,934 | Bozeman, MT | 30 Gibl 2025 | 7 Ògmh 2026 | Dearbhte | 403 |
| Lead Structural Concrete Form Setter (Multiple positions) | $53,934 | Bozeman, MT | 30 Gibl 2025 | 5 Ògmh 2026 | Dearbhte | 401 |
| Lead Flatwork Concrete Finisher (Multiple Positions) | $53,934 | Bozeman, MT | 12 Màrt 2025 | 20 Cèit 2026 | Dearbhte | 434 |
| Lead Flatwork Concrete Finisher (Multiple Positions) | $53,934 | Bozeman, MT | 12 Màrt 2025 | 12 Màrt 2025 | Air a tharraing air ais | — |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; bidh na staitistigean a’ cleachdadh iarrtasan làn-ùine teisteanasach. Is e teisteanas PERM aon cheum a dh’ionnsaigh caird-uaine; bidh USCIS a’ co-dhùnadh an ath-thagraidh. Chan e comhairle laghail a th’ ann. Stòr: Roinn Obrach nan SA, Dàta Foillseachaidh OFLC PERM, bliadhnaichean ionmhais 2024–2026 (co-dhùnadh as ùire 30 Ògmh 2026).