Dachaigh › H-2A › Flower Group USA LLC
Flower Group USA LLC: H-2A job orders
Chuir Flower Group USA LLC 10 òrdughan obrach H-2A a-steach a chaidh a dhearbhadh ann am bliadhnaichean ionmhais 2025–2026; dhearbh Roinn an Luchd-obrach 110 luchd-obrach. Tuarastal meadhanach $15.73 san uair.
Òrdughan obrach10
Luchd-obrach110
Tuarastal san uair$15.73
Seòladh an neach-fhastaidhHillister, TX
Òrdughan obrach as ùire
| Tiotal dreuchd | Luchd-obrach | Tuarastal san uair | Àite | Ceann-lachan | Còmhnaidh | Cuir a-steach |
|---|---|---|---|---|---|---|
| Horticultural Worker (45-2092.00) | 10 | $15.67 | Hillister, TX | 3 Lùna 2026 – 15 Samh 2026 | Employer | — |
| Horticultural Worker (45-2092.00) | 16 | $15.67 | Hillister, TX | 9 Gearr 2026 – 9 Ògmh 2026 | Employer | — |
| Horticultural Worker (45-2092.00) | 20 | $15.92 | Gaffney, SC | 9 Gearr 2026 – 11 Dàmh 2026 | Employer | — |
| Horticultural Worker (45-2092.00) | 5 | $15.92 | Gaffney, SC | 13 Faoi 2026 – 6 Ògmh 2026 | Employer | — |
| 19-4012 Agricultural Technicians | 3 | $27.4 | Hillister, TX | 29 Sult 2025 – 31 Cèit 2026 | Employer | — |
| Horticultural Worker (45-2092.00) | 5 | $15.79 | Hillister, TX | 16 Lùna 2025 – 16 Dùbh 2025 | Employer | — |
| Horticultural Worker (45-2092.00) | 10 | $15.79 | Hillister, TX | 16 Lùna 2025 – 16 Dùbh 2025 | Employer | — |
| Horticultural Worker (45-2092.00) | 16 | $15.55 | Hillister, TX | 10 Gearr 2025 – 31 Cèit 2025 | Employer | — |
| Horticultural Worker (45-2092.00) | 20 | $14.68 | Gaffney, SC | 28 Faoi 2025 – 5 Dàmh 2025 | Employer | — |
| Horticultural Worker (45-2092.00) | 5 | $14.68 | Gaffney, SC | 6 Faoi 2025 – 8 Ògmh 2025 | Employer | — |
Stàitean
Gnìomhachasan
Tha òrdughan obrach air an teisteanachadh le Roinn an Obrach mus cuir an cothromachadh athchuinge gu USCIS; tha ceann-lachan agus tuarastalan mar a chaidh an cur a-steach. Gus tagradh a dhèanamh airson obair, cleachd làrach-lìn a’ chothromaich ma tha e air a liostadh, buidheann obrach na stàite no seasonaljobs.dol.gov — na pàigh neach-fastaidh airson tabhartas obrach. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC H-2A, bliadhnaichean ionmhais 2025–2026 (co-dhùnadh as ùire 30 Ògmh 2026).