Dachaigh › H-2B › Cement Masons and Concrete Finishers › Colorado
H-2B jobs ann an Colorado: Cement Masons and Concrete Finishers
20 òrdughan obrach H-2B airson Cement Masons and Concrete Finishers le làraichean-obrach ann an Colorado; chaidh 219 luchd-obrach a dhearbhadh. Tuarastal meadhanach $28.72 san uair.
Òrdughan obrach as ùire
| Neach-obrach | Tiotal dreuchd | Luchd-obrach | Tuarastal san uair | Àite | Ceann-lachan | Còmhnaidh | Cuir a-steach |
|---|---|---|---|---|---|---|---|
| Mastercraft Concrete Contracting LLC | Concrete Laborer | 10 | $28.72 | Pagosa Springs, CO | 1 Cèit 2026 – 30 Samh 2026 | — | — |
| Three Brothers Concrete, Inc. | Concrete Finisher | 7 | $29.63 | Thornton, CO | 1 Gibl 2026 – 23 Dùbh 2026 | Còmhnaidh a chaidh a thabhann | — |
| Mastercraft Concrete Contracting LLC | Concrete Laborer | 10 | $28.72 | Pagosa Springs, CO | 1 Gibl 2026 – 30 Samh 2026 | — | — |
| Ralph L. Wadsworth Construction Company, LLC | Concrete Finisher Level 1 | 5 | $29.63 | Firestone, CO | 1 Gibl 2026 – 30 Samh 2026 | Còmhnaidh a chaidh a thabhann | Làrach-lìn |
| Concrete Concepts Design, Inc. (1783) | Concrete Finishers (AN) | 30 | $28.25 | Colorado Springs, CO | 1 Gibl 2026 – 13 Samh 2026 | — | — |
| Concrete Experts, LLC | Concrete Finisher | 7 | $29.63 | Colorado Springs, CO | 1 Gibl 2026 – 25 Samh 2026 | Còmhnaidh a chaidh a thabhann | — |
| All Phase Concrete Construction, Inc. (1801) | Cement Masons and Concrete Finishers (AD) | 20 | $29.63 | Englewood, CO | 1 Gibl 2026 – 31 Dùbh 2026 | — | — |
| Mastercraft Concrete Contracting LLC | Concrete Laborer | 8 | $28.72 | Pagosa Springs, CO | 1 Màrt 2026 – 30 Samh 2026 | — | — |
| Concrete Experts LLC (Fin) | Concrete Finishers | 10 | $27.18 | Colorado Springs, CO | 1 Gibl 2025 – 1 Dùbh 2025 | — | — |
| Three Brothers Concrete, Inc. | Concrete Finisher | 4 | $29.31 | Thornton, CO | 1 Gibl 2025 – 23 Dùbh 2025 | Còmhnaidh a chaidh a thabhann | Làrach-lìn |
| Genuine Builders Inc. | Concrete Finishers | 5 | $27.03 | Sterling, CO | 1 Gibl 2025 – 1 Dàmh 2025 | Còmhnaidh a chaidh a thabhann | — |
| Concrete Concepts Design Inc. (Fin) | Concrete Finishers | 30 | $27.01 | Colorado Springs, CO | 1 Gibl 2025 – 15 Samh 2025 | — | — |
| All Phase Concrete Construction, Inc. (Fin) | Concrete Finishers (Summer) | 20 | $29.31 | Englewood, CO | 1 Gibl 2025 – 31 Dùbh 2025 | — | — |
| B & M Concrete, Inc. | Concrete Flatwork Laborer | 15 | $26.97 | Fort Lupton, CO | 1 Gibl 2025 – 30 Samh 2025 | — | — |
| Mastercraft Concrete Contracting LLC | Concrete Laborer | 8 | $26.62 | Pagosa Springs, CO | 1 Màrt 2025 – 30 Samh 2025 | — | — |
| Even Construction, Inc. | H-2B Concrete Finishers | 30 | $27.01 | Colorado Springs, CO | 2 Dàmh 2024 – 11 Gibl 2025 | — | — |
Cothromaichean leis an àireamh as motha de luchd-obrach
| Neach-obrach | Luchd-obrach |
|---|---|
| Mastercraft Concrete Contracting LLC | 36 |
| Concrete Concepts Design Inc. (Fin) | 30 |
| Even Construction, Inc. | 30 |
| Concrete Concepts Design, Inc. (1783) | 30 |
| All Phase Concrete Construction, Inc. (Fin) | 20 |
| All Phase Concrete Construction, Inc. (1801) | 20 |
| B & M Concrete, Inc. | 15 |
| Three Brothers Concrete, Inc. | 11 |
| Concrete Experts LLC (Fin) | 10 |
| Concrete Experts, LLC | 7 |
| Genuine Builders Inc. | 5 |
| Ralph L. Wadsworth Construction Company, LLC | 5 |
| Mile High Home Ventures LLC | 0 |
Obraichean H-2B agus cothromaichean ann an Colorado →
Tha òrdughan obrach air an teisteanachadh le Roinn an Obrach mus cuir an cothromachadh athchuinge gu USCIS; tha ceann-lachan agus tuarastalan mar a chaidh an cur a-steach. Gus tagradh a dhèanamh airson obair, cleachd làrach-lìn a’ chothromaich ma tha e air a liostadh, buidheann obrach na stàite no seasonaljobs.dol.gov — na pàigh neach-fastaidh airson tabhartas obrach. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC H-2B, bliadhnaichean ionmhais 2025–2026 (co-dhùnadh as ùire 30 Ògmh 2026).