Dachaigh › H-2B › Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters › Texas
H-2B jobs ann an Texas: Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters
20 òrdughan obrach H-2B airson Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters le làraichean-obrach ann an Texas; chaidh 360 luchd-obrach a dhearbhadh. Tuarastal meadhanach $19.61 san uair.
Òrdughan obrach as ùire
| Neach-obrach | Tiotal dreuchd | Luchd-obrach | Tuarastal san uair | Àite | Ceann-lachan | Còmhnaidh | Cuir a-steach |
|---|---|---|---|---|---|---|---|
| LMS Lonestar Masonry & Stone Inc. | Helpers - Masons | 12 | $18.74 | Austin, TX | 1 Cèit 2026 – 20 Dùbh 2026 | — | — |
| Brick Paving Plus, Inc. | Laborer | 12 | $18.74 | Paige, TX | 1 Cèit 2026 – 30 Samh 2026 | — | — |
| Brick Paving Plus, Inc. | Laborer | 12 | $18.74 | Paige, TX | 1 Gibl 2026 – 30 Samh 2026 | — | — |
| Rodriguez & Sons Construction | Qualified Masons Helper | 33 | $19.61 | Seagoville, TX | 1 Gibl 2026 – 1 Dùbh 2026 | — | — |
| Rodriguez & Sons Construction | Masons Helper | 34 | $19.61 | Seagoville, TX | 1 Gibl 2026 – 1 Dùbh 2026 | — | — |
| Custom Retaining Wall | Masons Helper | 34 | $19.61 | Dallas, TX | 1 Gibl 2026 – 1 Dùbh 2026 | — | — |
| Custom Retaining Walls | Qualified Masons Helper | 33 | $19.61 | Dallas, TX | 1 Gibl 2026 – 1 Dùbh 2026 | — | — |
| Epic Pavers, Inc | Laborer | 40 | $19.61 | Euless, TX | 1 Gibl 2026 – 4 Dùbh 2026 | — | — |
| Epic Pavers, Inc | Laborer | 40 | $19.61 | Euless, TX | 5 Gearr 2026 – 4 Dùbh 2026 | — | — |
| MTZ Masonry & Construction Inc | Construction Helper | 5 | $19.81 | Mansfield, TX | 1 Dàmh 2025 – 30 Ògmh 2026 | Còmhnaidh a chaidh a thabhann | — |
| LMS Lonestar Masonry & Stone Inc. | Helpers - Masons | 5 | $18.39 | Austin, TX | 15 Iuch 2025 – 20 Dùbh 2025 | — | — |
| Epic Pavers, Inc | Laborer | 40 | $19.81 | Euless, TX | 1 Gibl 2025 – 4 Dùbh 2025 | — | — |
| Rodriguez & Sons Construction | Masons Helper | 30 | $19.81 | Seagoville, TX | 1 Gibl 2025 – 1 Dùbh 2025 | — | — |
| Custom Retaining Walls | Masons Helper | 30 | $19.81 | Dallas, TX | 1 Gibl 2025 – 1 Dùbh 2025 | — | — |
Cothromaichean leis an àireamh as motha de luchd-obrach
| Neach-obrach | Luchd-obrach |
|---|---|
| Epic Pavers, Inc | 120 |
| Rodriguez & Sons Construction | 97 |
| Custom Retaining Walls | 63 |
| Custom Retaining Wall | 34 |
| Brick Paving Plus, Inc. | 24 |
| LMS Lonestar Masonry & Stone Inc. | 17 |
| MTZ Masonry & Construction Inc | 5 |
| RCTEX Pavers and Hardscapes | 0 |
Obraichean H-2B agus cothromaichean ann an Texas →
Tha òrdughan obrach air an teisteanachadh le Roinn an Obrach mus cuir an cothromachadh athchuinge gu USCIS; tha ceann-lachan agus tuarastalan mar a chaidh an cur a-steach. Gus tagradh a dhèanamh airson obair, cleachd làrach-lìn a’ chothromaich ma tha e air a liostadh, buidheann obrach na stàite no seasonaljobs.dol.gov — na pàigh neach-fastaidh airson tabhartas obrach. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC H-2B, bliadhnaichean ionmhais 2025–2026 (co-dhùnadh as ùire 30 Ògmh 2026).