Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Architectural and Engineering Managers › Durham, NC

Architectural and Engineering Managers ann an Durham, NC: Tuarastalan H-1B

26 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Durham, NC. Tuarastal bunasach meadhanach $157,200; leth meadhanach $134,500–$191,500.

Iarrtasan (LCAs)26
Tuarastal meadhanach a chaidh a thabhann$157,200
Leath mheadhanach nan tuarastalan$134,500–$191,500
Ceudail 10mh–90mh$122,909–$253,267

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$125,000
Ìre II (càileachail)$142,100
Ìre III (eòlach)$190,000
Ìre IV (gu lèir comasach)$196,000

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Nutanix, Inc.4$170,398
Fisher-Rosemount Systems, Inc.2$188,794
Bell and Howell, LLC2$142,100
NVIDIA Corporation2$176,000
KBI Biopharma, Inc.2$184,000
Flexgen Power Systems2$190,016
VAStek Inc.1—
Cree LED, Inc.1$104,441
8 Rivers Services, LLC1$335,000
Wolfspeed, Inc.1$190,000
Insightfinder, Inc.1$128,648
TiVo Platform Technologies, LLC1$125,000
restor3d, inc.1$155,736
Corning Incorporated1$214,225
Flexgen Holdings Inc1$270,000
Strata Solar, LLC1$130,000
Aspen Creek Power Holdings, LLC1$136,000
Cypress Creek Renewables, LLC1$147,306

Tiotalan dreuchd

Luchd-taic H-1B ann an Durham, NC →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).