Dachaigh › Gnìomhan › Architectural and Engineering Managers › Foster City, CA
Architectural and Engineering Managers ann an Foster City, CA: Tuarastalan H-1B
34 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Foster City, CA. Tuarastal bunasach meadhanach $189,635; leth meadhanach $182,728–$225,992.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $143,000 |
| Ìre II (càileachail) | $182,728 |
| Ìre III (eòlach) | $221,000 |
| Ìre IV (gu lèir comasach) | $249,205 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Zoox Inc. | 29 | $203,000 |
| Tata Technologies, Inc. | 2 | $143,000 |
| Illumina, Inc. | 1 | $115,086 |
| Infotree Global Solutions Corp | 1 | $140,920 |
| BrightEdge Technologies, Inc. | 1 | $218,254 |
Tiotalan dreuchd
- Senior Technical Program Manager7
- Technical Program Manager4
- Senior Technical Program Manager, Active Suspension2
- Supervisor, Quality1
- Project Manager II1
- Manager, Interiors and Restraints1
- Project Coordinator1
- CAN Datalog Engineer1
- Senior Manager, Engineering1
- Program Manager, Vehicle1
- Manager, Hardware Software Integration1
- Staff Operations Manager, Manufacturing1
- Manager, Trajectory Generation1
- Manager, Robot Platform Safety, Trajectory Generation1
- Software Engineering Manager1
Luchd-taic H-1B ann an Foster City, CA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).