Dachaigh › Gnìomhan › Architectural and Engineering Managers › Irvine, CA
Architectural and Engineering Managers ann an Irvine, CA: Tuarastalan H-1B
129 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Irvine, CA. Tuarastal bunasach meadhanach $183,610; leth meadhanach $157,475–$214,950.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $136,115 |
| Ìre II (càileachail) | $170,000 |
| Ìre III (eòlach) | $200,006 |
| Ìre IV (gu lèir comasach) | $223,500 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
Tiotalan dreuchd
- Manager, Engineering8
- Engineering Manager5
- Director of Product Strategy and Pricing4
- Principal Engineer3
- Director, Engineering3
- DataX Department Manager3
- Product Line Manager2
- Senior Director of Engineering and R&D2
- Engineering Manager 22
- Senior Engineering Program Manager2
- Technical Account Manager2
- Director, Core Dynamics2
- Technical Sourcing Program Manager2
- Engineering Manager I2
- Senior Automation Manager2
Luchd-taic H-1B ann an Irvine, CA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).