Dachaigh › Gnìomhan › Civil Engineers › Allen, TX
Civil Engineers ann an Allen, TX: Tuarastalan H-1B
28 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Allen, TX. Tuarastal bunasach meadhanach $78,166; leth meadhanach $65,364–$99,473.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $65,000 |
| Ìre II (càileachail) | $84,469 |
| Ìre III (eòlach) | $120,000 |
| Ìre IV (gu lèir comasach) | $121,555 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Triangle Engineering LLC | 13 | $84,469 |
| White Hawk Engineering and Design, LLC | 10 | $78,166 |
| Maldonado-Burkett, LLP | 2 | $96,366 |
| Techmetro, LLC. | 1 | $81,702 |
| Cyient, Inc. | 1 | $69,160 |
| Dynamic Earth LLC | 1 | $90,000 |
Tiotalan dreuchd
- Civil Engineer5
- Civil Engineer-PM3
- Engineer in Training3
- Structural Engineer3
- Civil Engineer EIT2
- Structural Engineer in Training2
- Project Engineer2
- Traffic Engineer1
- Civil Engineer II1
- Roadway/Structural Engineer 11
- Engineer Technician1
- Graduate Engineer1
- Design Specialist1
- Engineering Analyst I1
- Geotechnical Engineer1
Luchd-taic H-1B ann an Allen, TX →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).