Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Civil Engineers › Richardson, TX

Civil Engineers ann an Richardson, TX: Tuarastalan H-1B

23 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Richardson, TX. Tuarastal bunasach meadhanach $77,500; leth meadhanach $70,000–$84,011.

Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$77,500
Leath mheadhanach nan tuarastalan$70,000–$84,011
Ceudail 10mh–90mh$66,582–$89,982

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$70,000
Ìre II (càileachail)$81,276
Ìre IV (gu lèir comasach)$130,000

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Othon, Inc.11$77,251
Parsons Transportation Group Inc.3$79,997
J4 Development, LP2$60,112
Pattern Energy Group Services LP2$88,218
SMR Construction, Inc2$82,500
AECOM Technical Services Inc1$80,756
Terreno Development Group LLC1$96,280
DK Painting Company, Inc.1$65,728

Tiotalan dreuchd

Luchd-taic H-1B ann an Richardson, TX →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).