Dachaigh › Gnìomhan › Civil Engineers › Richardson, TX
Civil Engineers ann an Richardson, TX: Tuarastalan H-1B
23 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Richardson, TX. Tuarastal bunasach meadhanach $77,500; leth meadhanach $70,000–$84,011.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $70,000 |
| Ìre II (càileachail) | $81,276 |
| Ìre IV (gu lèir comasach) | $130,000 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Othon, Inc. | 11 | $77,251 |
| Parsons Transportation Group Inc. | 3 | $79,997 |
| J4 Development, LP | 2 | $60,112 |
| Pattern Energy Group Services LP | 2 | $88,218 |
| SMR Construction, Inc | 2 | $82,500 |
| AECOM Technical Services Inc | 1 | $80,756 |
| Terreno Development Group LLC | 1 | $96,280 |
| DK Painting Company, Inc. | 1 | $65,728 |
Tiotalan dreuchd
- Project Lead3
- Transportation Graduate Engineer3
- Project Engineer3
- Project Engineer - Civil2
- Transportation Engineer in Training2
- Graduate Engineer2
- Engineer 11
- Project Manager - III1
- Engineer I1
- Sr. Drainage Engineer1
- Transportation Project Lead1
- Project Associate1
- Senior Project Analyst1
- Engineer in Training1
Luchd-taic H-1B ann an Richardson, TX →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).