Dachaigh › Gnìomhan › Civil Engineers › Suwanee, GA
Civil Engineers ann an Suwanee, GA: Tuarastalan H-1B
25 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Suwanee, GA. Tuarastal bunasach meadhanach $64,185; leth meadhanach $55,500–$79,128.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $55,500 |
| Ìre II (càileachail) | $83,387 |
| Ìre III (eòlach) | $137,000 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| KB Link Inc. | 5 | $55,500 |
| CMC, Inc | 4 | $76,107 |
| Eastern Contractors Corporation | 4 | $60,000 |
| Jun America, LLC | 3 | $55,500 |
| Azimuth Contractors LLC | 2 | $73,005 |
| Prism Response LLC | 1 | $115,000 |
| Ntess, LLC | 1 | $137,000 |
| N-Gineers LLC | 1 | $80,000 |
| Procon E&C GA Inc | 1 | — |
| Consulting Enterprises Corporation | 1 | $138,000 |
| United Consulting Group Ltd. | 1 | $76,502 |
| R&B Developer Inc | 1 | $68,370 |
Tiotalan dreuchd
- Construction Engineer8
- Civil Engineer8
- Civil Construction Engineer4
- Project Controls Engineer1
- R&D Civil/mechanical Engineer1
- Project Manager1
- Architectural Engineer1
- Project Engineer1
Luchd-taic H-1B ann an Suwanee, GA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).