Dachaigh › Gnìomhan › Civil Engineers, R&D › Oak Ridge, TN
Civil Engineers, R&D ann an Oak Ridge, TN: Tuarastalan H-1B
21 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Oak Ridge, TN. Tuarastal bunasach meadhanach $118,050; leth meadhanach $113,205–$126,396.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre II (càileachail) | $118,050 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Ut-Battelle, LLC (oak Ridge National Laboratory) | 21 | $118,050 |
Tiotalan dreuchd
- Advanced Mobility Research and Development Staff6
- R&D Associate - Building Envelope Materials Research2
- Postdoc Res Assc-Transportation Analytics & Dec Sciences2
- Associate Research & Development Scientist, Buildings Equip2
- Ultrasonics Engineer1
- R&D Associate Staff Member - Building Equipment Research1
- R&D Asst. Staff, Integrated Building Deployment & Analysis1
- Postdoctoral Research Associate - Composites InnovationGroup1
- R&D Associate, Transportation-Energy Analysis and Modeling1
- Research Ass.Integrated Building Deployment & Analysis Group1
- R&D Associate, Transportation Data Analytics & Decision Sci1
- Technical Staff, Transportation Data Analytics & Decision Sc1
- R&D Associate - Advanced Monitoring, Diagnosis, and Control1
Luchd-taic H-1B ann an Oak Ridge, TN →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).