Dachaigh › Gnìomhan › Computer and Information Systems Managers › Redwood City, CA
Computer and Information Systems Managers ann an Redwood City, CA: Tuarastalan H-1B
166 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Redwood City, CA. Tuarastal bunasach meadhanach $230,000; leth meadhanach $194,714–$255,000.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $172,588 |
| Ìre II (càileachail) | $200,304 |
| Ìre III (eòlach) | $237,682 |
| Ìre IV (gu lèir comasach) | $274,456 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
Tiotalan dreuchd
- Team Manager II, Software Development8
- Engineering Manager II6
- Director, Development5
- Engineering Manager4
- Senior Engineering Manager3
- Manager, Platform Engineering3
- Senior Team Manager, Software Development3
- Manager, Product Software Architecture and Engineering3
- Senior Manager, Security Assurance Engineering3
- Solution Principal2
- Director of Product2
- Senior Manager, Software Engineering2
- Senior Manager, IT2
- Senior Manager, Development2
- Lead Product Manager2
Luchd-taic H-1B ann an Redwood City, CA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).