Dachaigh › Gnìomhan › Computer and Information Systems Managers › Redwood Shores, CA
Computer and Information Systems Managers ann an Redwood Shores, CA: Tuarastalan H-1B
43 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Redwood Shores, CA. Tuarastal bunasach meadhanach $263,550; leth meadhanach $243,826–$273,915.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre IV (gu lèir comasach) | $273,915 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Oracle America, Inc. | 43 | $263,550 |
Tiotalan dreuchd
- Software Development Snr Manager11
- Software Development Director10
- Software Development Snr Director5
- IT Snr Manager5
- Software Development Senior Manager3
- IT Director3
- Software Development VP2
- Product Mgmt/Strategy Director-ProdDev2
- Product Mgmt/Strategy Snr Manager-1
- Product Mgmt/Strategy Snr Director-ProdDev1
Luchd-taic H-1B ann an Redwood Shores, CA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).