Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Computer Systems Engineers/Architects › Gainesville, FL

Computer Systems Engineers/Architects ann an Gainesville, FL: Tuarastalan H-1B

21 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Gainesville, FL. Tuarastal bunasach meadhanach $72,966; leth meadhanach $70,000–$99,570.

Iarrtasan (LCAs)21
Tuarastal meadhanach a chaidh a thabhann$72,966
Leath mheadhanach nan tuarastalan$70,000–$99,570
Ceudail 10mh–90mh$61,477–$108,584

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$60,000
Ìre II (càileachail)$72,311
Ìre III (eòlach)$102,544
Ìre IV (gu lèir comasach)$107,640

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Tiotalan dreuchd

Luchd-taic H-1B ann an Gainesville, FL →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).