Dachaigh › Gnìomhan › Cost Estimators › Boston, MA
Cost Estimators ann an Boston, MA: Tuarastalan H-1B
21 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Boston, MA. Tuarastal bunasach meadhanach $102,038; leth meadhanach $87,685–$130,325.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $77,400 |
| Ìre II (càileachail) | $93,500 |
| Ìre III (eòlach) | $105,250 |
| Ìre IV (gu lèir comasach) | $142,475 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Rider Levett Bucknall Ltd. | 4 | $134,950 |
| City Point Partners, LLC | 3 | $90,000 |
| Hooli Homes Boston, Inc. | 3 | $84,000 |
| WTP America LLC | 3 | $110,000 |
| Boston Masonry, Inc. | 2 | $89,440 |
| Hooli Homes USA, Inc. | 1 | — |
| Trenmor LLC | 1 | $62,774 |
| Turner & Townsend, Inc. | 1 | $125,000 |
| Keolis Commuter Services LLC | 1 | $315,000 |
| Keolis America, Inc. | 1 | $315,000 |
| Island Facades, LLC | 1 | $87,100 |
Tiotalan dreuchd
- Senior Cost Manager4
- Project Analyst4
- Cost Estimator3
- Bid Director2
- Cost Estimators1
- Senior Advisor1
- Assistant Cost Manager1
- Cost Estimator Project Advisor1
- Consultant, Cost Management1
- Cost Manager1
- Estimator1
- Construction Cost Estimator1
Luchd-taic H-1B ann an Boston, MA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).