Dachaigh › Gnìomhan › Cost Estimators › Dallas, TX
Cost Estimators ann an Dallas, TX: Tuarastalan H-1B
40 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Dallas, TX. Tuarastal bunasach meadhanach $91,798; leth meadhanach $78,094–$120,368.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $75,000 |
| Ìre II (càileachail) | $82,500 |
| Ìre III (eòlach) | $120,368 |
| Ìre IV (gu lèir comasach) | $111,768 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| SLS Consultants, LLC | 6 | $125,000 |
| Alsal Construction, Inc. | 3 | $73,415 |
| Trenmor LLC | 3 | $97,136 |
| Baker Concrete Construction, Inc. | 2 | $124,800 |
| Peak Time Investments Inc | 2 | $75,000 |
| Fluor Enterprises, Inc. | 2 | $98,778 |
| DPR Construction, A General Partnership | 2 | $83,666 |
| AtkinsRealis USA Inc. | 2 | $120,368 |
| Reflection Window Company, LLC | 2 | $84,000 |
| Atkins North America Inc. | 1 | $57,034 |
| Barnsco Texas | 1 | $61,800 |
| Cumming Management Group, Inc. | 1 | $90,000 |
| Quality 1 Energy Systems | 1 | $60,000 |
| Gardiner & Theobald, Inc. | 1 | $140,000 |
| Essilor Laboratories of America, Inc. | 1 | $81,000 |
| Exposed Floor Design Group, LLC | 1 | $100,000 |
| Structure Tone Southwest LLC | 1 | $77,459 |
| WSP USA Inc. | 1 | $123,535 |
| Southwest Sealers, Inc. | 1 | $75,000 |
| SMS InfoComm Corporation | 1 | $47,715 |
| Jacobs Engineering Group Inc. | 1 | $131,320 |
| Azteca Enterprises, LLC | 1 | $83,000 |
| Core Cmci | 1 | $68,000 |
| Commercial Roofing Services Group LLC | 1 | $87,000 |
| Altus Construction LLC | 1 | $90,000 |
Tiotalan dreuchd
- Cost Manager8
- Estimator7
- Construction Cost Estimator3
- Cost Estimator3
- Project Estimator2
- Project Controls Specialist2
- Senior Cost Manager2
- Project Estimator (Commercial Construction)1
- Head Estimator1
- Associate Director, Cost Management1
- Analyst - Pricing1
- Sr. Estimator1
- Cost Estimator (Preconstruction)1
- Lead Consultant, Estimating1
- Estimator (SP) – Division 71
Luchd-taic H-1B ann an Dallas, TX →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).