Dachaigh › Gnìomhan › Cost Estimators › Miami, FL
Cost Estimators ann an Miami, FL: Tuarastalan H-1B
59 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Miami, FL. Tuarastal bunasach meadhanach $89,999; leth meadhanach $70,000–$108,599.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $56,000 |
| Ìre II (càileachail) | $65,205 |
| Ìre III (eòlach) | $89,999 |
| Ìre IV (gu lèir comasach) | $103,788 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Coastal Construction of Miami-Dade County, Inc. | 21 | $94,999 |
| OHLA Building, Inc. | 4 | $91,229 |
| Cma CGM (america) LLC | 4 | $65,316 |
| Cumming Management Group, Inc. | 3 | $106,000 |
| Om Development Group LLC | 2 | $53,643 |
| Gardiner & Theobald, Inc. | 2 | $160,000 |
| PRH Investments, LLC | 2 | $178,750 |
| U.S. Cost Inc. | 2 | $120,000 |
| Intelligent Construction Inc. | 2 | $70,000 |
| CMC Construction, Inc. | 2 | $96,762 |
| Del Cielo, LLC | 1 | $65,000 |
| Fiocchi Group LLC | 1 | $120,000 |
| Currie & Brown Inc. | 1 | $84,344 |
| GLF Construction Corporation | 1 | $56,000 |
| Americaribe, LLC | 1 | $82,000 |
| Pinnacle A Roofing Company | 1 | $71,999 |
| Epic Consultants, Inc. | 1 | $70,000 |
| HDZ Builders, Inc. | 1 | $65,205 |
| Novo Marble LLC | 1 | $61,000 |
| Sajo Inc | 1 | $64,688 |
| NV2A Group, LLC | 1 | $120,000 |
| Keurig Green Mountain Inc. | 1 | $72,100 |
| Nandez D&d, LLC | 1 | $96,762 |
| Lunacon Engineering Group, Corp. | 1 | $96,762 |
| GOFO Inc. | 1 | $52,000 |
Tiotalan dreuchd
- Cost Estimator29
- Preconstruction Manager4
- Cost Engineer3
- Project Manager/Estimator2
- Associate Director, Cost Management2
- Chief Estimator2
- Cost Estimator II2
- Pricing Analyst2
- Head of Real Estate Department1
- BIM Coordinator1
- Project Manager1
- Director, Healthcare1
- Junior Estimator1
- Cost Controller1
- Assistant Project Manager1
Luchd-taic H-1B ann an Miami, FL →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).