Dachaigh › Gnìomhan › Cost Estimators › San Francisco, CA
Cost Estimators ann an San Francisco, CA: Tuarastalan H-1B
112 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an San Francisco, CA. Tuarastal bunasach meadhanach $132,750; leth meadhanach $110,859–$149,500.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $82,514 |
| Ìre II (càileachail) | $115,000 |
| Ìre III (eòlach) | $128,000 |
| Ìre IV (gu lèir comasach) | $150,000 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Turner & Townsend, Inc. | 41 | $139,000 |
| Cumming Management Group, Inc. | 17 | $125,000 |
| Crusoe Energy Systems, Inc. | 5 | $188,000 |
| Swinerton Incorporated | 4 | $103,178 |
| Agurto Corporation | 4 | $79,071 |
| Arup US, Inc. | 4 | $90,600 |
| Rider Levett Bucknall Ltd. | 4 | $174,500 |
| Plant/Allison Corporation | 3 | $105,000 |
| TB Construction Consultants LLC | 3 | $132,500 |
| Currie & Brown Inc. | 3 | $120,000 |
| T.Y. Lin International | 3 | $95,200 |
| Gardiner & Theobald, Inc. | 3 | $148,930 |
| WSP USA Inc. | 3 | $82,514 |
| Mace North America Limited | 3 | $145,000 |
| Tom's Metal Specialists Inc. | 2 | $62,157 |
| The Boldt Company | 1 | $145,000 |
| Atkins North America Inc. | 1 | $119,267 |
| Evidera, Inc. | 1 | $75,000 |
| Jacobs Project Management Company | 1 | $152,212 |
| AECOM Technical Services Inc | 1 | $240,000 |
| DPR Construction, A General Partnership | 1 | $165,000 |
| C M Pros | 1 | $111,654 |
| Wickman Development and Construction | 1 | $80,000 |
| Minerva Construction, Inc. | 1 | $89,502 |
| Ground Control Inc. | 1 | $111,654 |
Tiotalan dreuchd
- Senior Cost Manager14
- Cost Estimator9
- Cost Manager6
- Senior Consultant, Cost Management6
- Analyst4
- Senior Cost Consultant4
- Associate Director3
- Consultant, Cost Management3
- Associate Principal3
- Consultant, Estimation3
- Associate Director, Cost Management3
- Sr. Consultant, Estimation3
- Construction Cost Estimator2
- Cost Estimator (Consultant)2
- Project Controls Consultant (Cost Estimation)2
Luchd-taic H-1B ann an San Francisco, CA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).