Dachaigh › Gnìomhan › Cost Estimators › Washington, DC
Cost Estimators ann an Washington, DC: Tuarastalan H-1B
26 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Washington, DC. Tuarastal bunasach meadhanach $80,000; leth meadhanach $74,901–$110,000.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $64,890 |
| Ìre II (càileachail) | $80,000 |
| Ìre III (eòlach) | $110,000 |
| Ìre IV (gu lèir comasach) | $140,000 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| IOS Employment, LLC | 6 | $64,890 |
| Mark G. Anderson Consultants, Inc. | 5 | $80,000 |
| MCN Build, Inc. | 3 | $80,000 |
| HRGM Corporation | 3 | $110,000 |
| Cube Root Corporation | 2 | $94,765 |
| Atmos Solutions Inc. | 2 | $74,901 |
| Blackwood of DC | 1 | $110,000 |
| San Jose Construction Group, Inc. | 1 | $80,000 |
| Spark Community Investment Company | 1 | $882,000 |
| Marous Brothers Construction Inc. | 1 | $67,500 |
| Information Unlimited Inc. | 1 | $91,686 |
Tiotalan dreuchd
- Cost Estimator8
- Estimator6
- Assistant Cost Consultant3
- Senior Cost Consultant1
- Cost Consultant1
- Project Estimator1
- Construction Estimator1
- Program Manager1
- Senior Estimator1
- Sr. Construction Project Estimator1
- Project Engineer1
- Business Cost Estimator1
Luchd-taic H-1B ann an Washington, DC →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).