Dachaigh › Gnìomhan › Electrical Engineers › Knoxville, TN
Electrical Engineers ann an Knoxville, TN: Tuarastalan H-1B
24 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Knoxville, TN. Tuarastal bunasach meadhanach $90,791; leth meadhanach $72,169–$114,268.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $71,786 |
| Ìre II (càileachail) | $93,642 |
| Ìre III (eòlach) | $115,690 |
| Ìre IV (gu lèir comasach) | $160,000 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Texas Instruments Incorporated | 10 | $100,321 |
| The University of Tennessee | 3 | $72,000 |
| Mesa Associates, Inc. | 3 | $83,242 |
| Mitsubishi Electric Power Products, Inc. | 2 | $101,494 |
| Electric Power Research Institute, Inc. (EPRI) | 1 | $72,675 |
| Online Development Inc | 1 | $110,000 |
| Type One Energy Group Inc. | 1 | $180,000 |
| Knoxville Utilities Board | 1 | $90,000 |
| EnerNex LLC | 1 | $99,201 |
| Terabase Energy, Inc. | 1 | $140,000 |
Tiotalan dreuchd
- Analog Design Engineer3
- Design Verification Engr/Design Ver Dev Program 263
- Systems Studies Engineer II1
- Research Associate II1
- Senior Electrical Engineer1
- Staff - Level III1
- Electronics Hardware Engineer1
- Substation Engineering Associate1
- Post Doctoral Research Associate1
- Research Assistant Professor1
- Senior Power Plant Design Engineer1
- Digital Design Engineer1
- Electrical Engineer “ DER1
- Power Systems Engineer1
- Systems Studies Engineer III1
Luchd-taic H-1B ann an Knoxville, TN →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).