Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Electrical Engineers › Lake Forest, CA

Electrical Engineers ann an Lake Forest, CA: Tuarastalan H-1B

22 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Lake Forest, CA. Tuarastal bunasach meadhanach $130,000; leth meadhanach $111,426–$146,619.

Iarrtasan (LCAs)22
Tuarastal meadhanach a chaidh a thabhann$130,000
Leath mheadhanach nan tuarastalan$111,426–$146,619
Ceudail 10mh–90mh$100,000–$157,123

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$81,682
Ìre II (càileachail)$130,000
Ìre III (eòlach)$135,200
Ìre IV (gu lèir comasach)$157,123

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Alcon Research, LLC6$151,871
Intertek Testing Services NA, Inc.5$110,000
Schneider Electric USA, Inc.3$130,000
Schneider Electric Systems USA Inc.3$130,000
Advantest America Inc.2$130,239
Leoch Battery Corporation1—
Astera Labs INC1$157,123
SemiQ, Incorporated1$140,000

Tiotalan dreuchd

Luchd-taic H-1B ann an Lake Forest, CA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).