Dachaigh › Gnìomhan › Electrical Engineers › Orlando, FL
Electrical Engineers ann an Orlando, FL: Tuarastalan H-1B
93 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Orlando, FL. Tuarastal bunasach meadhanach $115,606; leth meadhanach $90,699–$130,000.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $79,571 |
| Ìre II (càileachail) | $102,105 |
| Ìre III (eòlach) | $120,000 |
| Ìre IV (gu lèir comasach) | $130,294 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
Tiotalan dreuchd
- RF Engineer8
- Field Service Engineer4
- Electrical Engineer 53
- Lead Engineer3
- Specialist Engineer3
- System Engineer and Project Manager - SCADA3
- Solution Engineer3
- Senior Engineer - Factory Management & Control Systems3
- Engineering Project Manager3
- Senior Electromechanical Engineer2
- Controls Engineer2
- Solutions Engineer2
- Engineer2
- Electrical Engineer2
- Performance and Modeling Engineering2
Luchd-taic H-1B ann an Orlando, FL →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).