Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Electrical Engineers › Peachtree City, GA

Electrical Engineers ann an Peachtree City, GA: Tuarastalan H-1B

23 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Peachtree City, GA. Tuarastal bunasach meadhanach $113,734; leth meadhanach $95,205–$127,500.

Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$113,734
Leath mheadhanach nan tuarastalan$95,205–$127,500
Ceudail 10mh–90mh$78,819–$147,404

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$82,680
Ìre II (càileachail)$97,282
Ìre III (eòlach)$119,809
Ìre IV (gu lèir comasach)$148,946

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Eaton Corporation13$119,809
Panasonic Corporation of North America (PNA)4$105,508
TSG U.S.A., Inc.2$72,176
Epitec, Inc.1$82,680
Harman Becker Automotive Systems, Inc.1$215,000
TRC Environmental Corporation1$77,854
CertainTeed LLC1$97,157

Tiotalan dreuchd

Luchd-taic H-1B ann an Peachtree City, GA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).