Dachaigh › Gnìomhan › Industrial Engineers › Berkeley, CA
Industrial Engineers ann an Berkeley, CA: Tuarastalan H-1B
28 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Berkeley, CA. Tuarastal bunasach meadhanach $137,627; leth meadhanach $115,638–$155,938.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $91,656 |
| Ìre II (càileachail) | $112,320 |
| Ìre III (eòlach) | $145,524 |
| Ìre IV (gu lèir comasach) | $155,875 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Form Energy, Inc. | 10 | $156,000 |
| Twelve Benefit Corporation | 5 | $143,272 |
| Bayer U.S. LLC | 3 | $145,524 |
| Michael Schwemberger | 3 | $99,840 |
| Total Validation Services, Inc. | 2 | $120,000 |
| TotalEnergies Renewables USA, LLC | 2 | $120,666 |
| Perfect Day, Inc. | 1 | $114,950 |
| Omni Consulting Services LLC | 1 | $88,629 |
| Validation Associates LLC | 1 | $94,682 |
Tiotalan dreuchd
- Technical Program Manager, Product Development3
- Staff Supplier Industrial Engineer3
- Principal Specialist Manufacturing IT2
- Validation Engineer II2
- Project Engineer2
- Supply Chain Planner1
- Quality Engineer1
- Egineering Document Specialist/ Validation1
- Engineering Documention Validation/Specialist1
- Engineering Documentation/Validation Specialist1
- Engineer1
- Senior Field Performance Test Engineer1
- Staff QC Engineer1
- Senior Field Test Engineer1
- Senior Supplier Industrialization Engineer, Mechanical1
Luchd-taic H-1B ann an Berkeley, CA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).