Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Industrial Engineers › Dayton, OH

Industrial Engineers ann an Dayton, OH: Tuarastalan H-1B

25 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Dayton, OH. Tuarastal bunasach meadhanach $80,080; leth meadhanach $76,478–$95,000.

Iarrtasan (LCAs)25
Tuarastal meadhanach a chaidh a thabhann$80,080
Leath mheadhanach nan tuarastalan$76,478–$95,000
Ceudail 10mh–90mh$71,864–$110,542

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$74,000
Ìre II (càileachail)$79,000
Ìre III (eòlach)$105,678
Ìre IV (gu lèir comasach)$123,441

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Mancor Ohio Inc8$80,080
Norwood Medical LLC4$74,000
Trimble Inc.2$102,839
APS Materials, Inc.2$69,202
Hendrickson USA, L.L.C.1$101,920
NDC Technologies Inc.1$78,957
Automation Systems & Design1$72,322
MAHLE Behr Dayton, LLC1$78,957
MAHLE Behr USA, Inc.1$130,000
Premier Investment Casting Group LLC1$79,000
Dayton-Phoenix Group, Inc.1$70,034
Shark Analytics LLC1$90,000
AES Clean Energy Services, LLC1$144,962

Tiotalan dreuchd

Luchd-taic H-1B ann an Dayton, OH →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).