Dachaigh › Gnìomhan › Industrial Engineers › Everett, WA
Industrial Engineers ann an Everett, WA: Tuarastalan H-1B
21 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Everett, WA. Tuarastal bunasach meadhanach $114,000; leth meadhanach $98,499–$144,495.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $89,556 |
| Ìre II (càileachail) | $102,523 |
| Ìre III (eòlach) | $160,000 |
| Ìre IV (gu lèir comasach) | $139,620 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| The Boeing Company | 9 | $144,549 |
| Fluke Electronics Corporation | 4 | $102,523 |
| Fluke Manufacturing Corporation | 2 | $83,647 |
| Safran Ventilation Systems USA, LLC | 2 | $89,556 |
| Bucher Aerospace Corporation | 1 | $94,973 |
| Intelex Technologies US Inc. | 1 | $134,763 |
| ZeroAvia, Inc. | 1 | $120,000 |
| AeroMech Incorporated | 1 | $92,500 |
Tiotalan dreuchd
- Manufacturing Engineer (Assembly and Installation)3
- User Experience Designer2
- Manufacturing Engineer 12
- Head of Quality Assurance1
- Director, CCO Operations1
- UX Designer1
- Production Planning Manager1
- Quality Engineer “ Processes & Tools - KBGFJG280666-11
- Quality Engineer - KBGFJG211380-51
- Manufacturing Engineer1
- Validation Engineer1
- BCA 777 Manufacturing:Composite Wing Assembly, Manager Level1
- BCA Production Engineering, Manager K level(Leadership Devel1
- Quality Assurance Manager1
- Product Sustainment Engineer1
Luchd-taic H-1B ann an Everett, WA →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).