Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Industrial Engineers › Livermore, CA

Industrial Engineers ann an Livermore, CA: Tuarastalan H-1B

40 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Livermore, CA. Tuarastal bunasach meadhanach $131,400; leth meadhanach $110,536–$155,750.

Iarrtasan (LCAs)40
Tuarastal meadhanach a chaidh a thabhann$131,400
Leath mheadhanach nan tuarastalan$110,536–$155,750
Ceudail 10mh–90mh$98,800–$163,592

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$94,000
Ìre II (càileachail)$111,582
Ìre III (eòlach)$142,175
Ìre IV (gu lèir comasach)$155,750

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
FormFactor, Inc.10$145,000
Zimeno Inc.5$160,500
Tesla, Inc.5$152,700
thyssenkrupp Supply Chain Services NA, Inc.3$125,000
Western Digital Technologies, Inc.3$131,400
Ancile Inc3$90,251
Myheatsinks, Inc.2$104,500
Topcon Positioning Systems, Inc.2$139,009
Exel, Inc.1$94,000
Westec Plastics Corporation1$90,251
IMG Companies, LLC1$140,000
Agility Robotics Inc.1$215,000
Redwood Multimedia Inc.1$110,000
Brooks Automation US, LLC1$142,175
Siemens Industry, Inc.1$126,000

Tiotalan dreuchd

Luchd-taic H-1B ann an Livermore, CA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).