Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Industrial Engineers › Perrysburg, OH

Industrial Engineers ann an Perrysburg, OH: Tuarastalan H-1B

24 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Perrysburg, OH. Tuarastal bunasach meadhanach $83,554; leth meadhanach $67,517–$106,064.

Iarrtasan (LCAs)24
Tuarastal meadhanach a chaidh a thabhann$83,554
Leath mheadhanach nan tuarastalan$67,517–$106,064
Ceudail 10mh–90mh$65,755–$112,612

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$67,517
Ìre II (càileachail)$81,307
Ìre IV (gu lèir comasach)$112,611

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
First Solar, Inc.21$80,700
Owens Corning Roofing and Asphalt, LLC1$101,067
Owens-Illinois General, Inc.1$112,611
KPIT Technologies, Inc.1$86,000

Tiotalan dreuchd

Luchd-taic H-1B ann an Perrysburg, OH →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).