Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Industrial Engineers › Santa Cruz, CA

Industrial Engineers ann an Santa Cruz, CA: Tuarastalan H-1B

23 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Santa Cruz, CA. Tuarastal bunasach meadhanach $150,000; leth meadhanach $131,175–$170,000.

Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$150,000
Leath mheadhanach nan tuarastalan$131,175–$170,000
Ceudail 10mh–90mh$106,500–$184,600

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre II (càileachail)$130,000
Ìre III (eòlach)$166,500
Ìre IV (gu lèir comasach)$183,500

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Joby Aero, Inc.20$155,000
HP Inc.1$91,021
Product Realization Group, Inc.1$156,000
Paramagnetix, Inc.1$105,000

Tiotalan dreuchd

Luchd-taic H-1B ann an Santa Cruz, CA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).