Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Industrial Engineers › Secaucus, NJ

Industrial Engineers ann an Secaucus, NJ: Tuarastalan H-1B

64 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Secaucus, NJ. Tuarastal bunasach meadhanach $118,326; leth meadhanach $95,184–$129,992.

Iarrtasan (LCAs)64
Tuarastal meadhanach a chaidh a thabhann$118,326
Leath mheadhanach nan tuarastalan$95,184–$129,992
Ceudail 10mh–90mh$89,398–$148,068

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$75,816
Ìre II (càileachail)$95,368
Ìre III (eòlach)$113,173
Ìre IV (gu lèir comasach)$130,000

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
ZT Group Int'l, Inc.45$116,400
ZT Group Int'l, Inc. d/b/a ZT Systems4$134,985
AMD Design LLC4$110,562
Amazon Data Services, Inc3$228,000
Unique Designs Inc2—
TE Connectivity Corporation1$120,000
Variscale Service & Engineering, Inc.1$89,398
Variscale Services & Engineering, Inc.1$89,398
Global Interactive Logistics, LLC1$125,000
Ryder System, Inc.1$124,030
At Last Sportswear Inc1$75,816

Tiotalan dreuchd

Luchd-taic H-1B ann an Secaucus, NJ →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).