Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Industrial Engineers › Winston-Salem, NC

Industrial Engineers ann an Winston-Salem, NC: Tuarastalan H-1B

24 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Winston-Salem, NC. Tuarastal bunasach meadhanach $89,803; leth meadhanach $81,162–$101,780.

Iarrtasan (LCAs)24
Tuarastal meadhanach a chaidh a thabhann$89,803
Leath mheadhanach nan tuarastalan$81,162–$101,780
Ceudail 10mh–90mh$74,086–$110,000

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$64,116
Ìre II (càileachail)$81,162
Ìre III (eòlach)$90,000
Ìre IV (gu lèir comasach)$109,000

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
B/E Aerospace, Inc.8$81,162
TE Connectivity Corporation7$90,000
ProKidney LLC4$112,115
Tekni-Plex, Inc.2$92,070
Sterling Construction Services, Inc.1$61,776
Salem Fabrication Technologies Group, Inc.1$66,456
ACR Technology LLC1$81,162

Tiotalan dreuchd

Luchd-taic H-1B ann an Winston-Salem, NC →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).