Dachaigh › Gnìomhan › Logisticians › Greensboro, NC
Logisticians ann an Greensboro, NC: Tuarastalan H-1B
24 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Greensboro, NC. Tuarastal bunasach meadhanach $81,000; leth meadhanach $70,000–$94,762.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $81,000 |
| Ìre II (càileachail) | $75,170 |
| Ìre III (eòlach) | $90,000 |
| Ìre IV (gu lèir comasach) | $87,000 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Volvo Group North America, LLC | 15 | $87,000 |
| Gilbarco Inc. | 2 | $64,626 |
| Global Logistical Connections, Inc. | 2 | $85,000 |
| TE Connectivity Corporation | 2 | $70,000 |
| Kontoor US, LLC | 1 | $106,877 |
| Gilbarco Inc. d/b/a Gilbarco Veeder-Root | 1 | $70,616 |
| VF Services, LLC | 1 | $80,340 |
Tiotalan dreuchd
- Digital Developer4
- Operational Planner2
- Supply Chain Analyst2
- Customs Entry Writer2
- Technical Business Analyst2
- Supply Chain Analyst-Back Order Receovery1
- Packaging Excellence Leader1
- Lead Analyst1
- Material Planner1
- Data Analyst1
- Materials Planner1
- Dealer Inventory Management Analyst1
- Sr Analyst, Logistics Procurement - KBGFJG185425-31
- Supervisor Logistics1
- Supply Chain Design Specialist1
Luchd-taic H-1B ann an Greensboro, NC →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).