Dachaigh › Gnìomhan › Mechanical Engineers › Allen Park, MI
Mechanical Engineers ann an Allen Park, MI: Tuarastalan H-1B
195 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Allen Park, MI. Tuarastal bunasach meadhanach $99,840; leth meadhanach $89,440–$115,860.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $76,200 |
| Ìre II (càileachail) | $93,642 |
| Ìre III (eòlach) | $110,120 |
| Ìre IV (gu lèir comasach) | $125,081 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
Tiotalan dreuchd
- HIL Test Engineer - Mid11
- Engineering Consultant 29
- Calibration Engineer8
- HIL Test Engineer6
- HIL Testing Engineer6
- Design Engineer5
- Vev Test Engineer4
- Product Engineer4
- Product Development Engineer4
- Integration & Test Engineer II3
- Mechanical Engineer3
- Systems Validation Engineer3
- Engineering Consultant 2- Automotive3
- Product Engineer Components2
- Product Engineer General2
Luchd-taic H-1B ann an Allen Park, MI →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).