Dachaigh › Gnìomhan › Mechanical Engineers › Appleton, WI
Mechanical Engineers ann an Appleton, WI: Tuarastalan H-1B
30 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Appleton, WI. Tuarastal bunasach meadhanach $90,040; leth meadhanach $84,241–$95,000.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $67,746 |
| Ìre II (càileachail) | $86,150 |
| Ìre III (eòlach) | $92,150 |
| Ìre IV (gu lèir comasach) | $142,614 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Taal Technologies Inc | 19 | $89,929 |
| Gulfstream Aerospace Services Corporation | 6 | $121,634 |
| Fishbone Technical Services LLC | 1 | $80,662 |
| Jacobs Engineering Group Inc. | 1 | $149,437 |
| B & P Mechanical Inc. | 1 | $65,500 |
| Aerosapien Technologies LLC | 1 | $84,500 |
| Voith US Inc. | 1 | $109,803 |
Tiotalan dreuchd
- Design Engineer13
- Mechanical Engineer5
- Technical Specialist II1
- Project Engineer1
- Mechanical Engineering Professional Senior1
- Design Engineer / Mechanical Engineer1
- Stress Analyst Technical Specialist (Engineer III)1
- Engineer I-NX1
- Completions Technicial Specialist II1
- Sr. Mechanical Engineer1
- Mechanical Design Engineer1
- Completions Technical Specialist III1
- Engineer II1
- Field Service Expert1
Luchd-taic H-1B ann an Appleton, WI →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).