Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Mechanical Engineers › Auburn, AL

Mechanical Engineers ann an Auburn, AL: Tuarastalan H-1B

23 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Auburn, AL. Tuarastal bunasach meadhanach $80,226; leth meadhanach $69,000–$96,930.

Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$80,226
Leath mheadhanach nan tuarastalan$69,000–$96,930
Ceudail 10mh–90mh$63,438–$102,757

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$64,850
Ìre II (càileachail)$95,000
Ìre III (eòlach)$98,946
Ìre IV (gu lèir comasach)$117,500

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
2a USA, Inc.9$66,200
SiO2 Medical Products, Inc.8$96,930
Schmidt Automotive USA LP2$76,294
Sodecia Safety & Mobility Auburn, Inc.2$75,000
CSP Technologies, Inc.1$98,946
Auburn University1$95,285

Tiotalan dreuchd

Luchd-taic H-1B ann an Auburn, AL →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).