Dachaigh › Gnìomhan › Mechanical Engineers › Normal, IL
Mechanical Engineers ann an Normal, IL: Tuarastalan H-1B
167 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Normal, IL. Tuarastal bunasach meadhanach $115,690; leth meadhanach $102,472–$134,000.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $82,500 |
| Ìre II (càileachail) | $100,098 |
| Ìre III (eòlach) | $125,000 |
| Ìre IV (gu lèir comasach) | $121,148 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Rivian Automotive, LLC | 154 | $116,069 |
| HCL America Solutions Inc | 4 | $76,752 |
| Athena Tech, Inc. | 2 | $70,720 |
| Epitec, Inc. | 1 | $167,003 |
| HCL America Inc | 1 | $88,421 |
| Rockwell Automation, Inc. | 1 | $139,309 |
| Caresoft Global Technologies Inc | 1 | $87,000 |
| Satyam Venture Engineering Services Pvt. Ltd. | 1 | $68,000 |
| Pentangle Tech Services LLC | 1 | $1,140,000 |
| Rivian and VW Group Technology, LLC | 1 | $120,000 |
Tiotalan dreuchd
- Sr. Process Engineer13
- Mechanical Engineers - II5
- Manager, Process Engineering5
- Sr. Automation Controls Engineer5
- Senior Process Engineer4
- Sr. Manufacturing Engineer4
- Process Engineer3
- Automation Controls Engineer3
- Sr. Resident Engineer3
- Senior Automation Controls Engineer3
- Staff Metrology Engineer3
- Senior Global Supply Manager, CapEx3
- Process Engineer - General Assembly2
- Sr. Process Engineer - Battery2
- Industrial Engineer2
Luchd-taic H-1B ann an Normal, IL →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).