Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Mechanical Engineers › Suwanee, GA

Mechanical Engineers ann an Suwanee, GA: Tuarastalan H-1B

34 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Suwanee, GA. Tuarastal bunasach meadhanach $83,580; leth meadhanach $74,970–$95,000.

Iarrtasan (LCAs)34
Tuarastal meadhanach a chaidh a thabhann$83,580
Leath mheadhanach nan tuarastalan$74,970–$95,000
Ceudail 10mh–90mh$66,904–$102,340

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$74,440
Ìre II (càileachail)$89,523
Ìre III (eòlach)$104,985

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Geekplus America Inc.12$83,500
Mujin Corp.2$85,592
NSI-MI Technologies, Inc.2$97,430
Eastern Contractors Corporation2$85,000
Pai Industries Inc.2$85,440
eConsultants Inc.1$100,000
Techwork Force, LLC1$85,000
Cheng Shin Rubber USA, Inc.1$78,907
Datamart Systems, Inc.1$66,400
Hussmann Corporation1$127,500
VSP, LLC1—
Procon E&C GA Inc1—
Ais Wsi LLC1$95,787
Blue Screen Solution, LLC1$66,560
Techlong International Inc.1$66,310
Ames Tools Corporation1$90,000
Grey Orange Incorporated1$72,779
Maxxis International – USA1$109,970
Murrelektronik, Inc.1$70,000

Tiotalan dreuchd

Luchd-taic H-1B ann an Suwanee, GA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).