Dachaigh › Gnìomhan › Network and Computer Systems Administrators › Brentwood, TN
Network and Computer Systems Administrators ann an Brentwood, TN: Tuarastalan H-1B
22 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Brentwood, TN. Tuarastal bunasach meadhanach $88,774; leth meadhanach $75,587–$89,523.
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre II (càileachail) | $75,587 |
| Ìre III (eòlach) | $100,568 |
| Ìre IV (gu lèir comasach) | $110,469 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Infosys Limited | 11 | $89,523 |
| Tractor Supply Company | 3 | $110,469 |
| DaVita, Inc. | 2 | $109,668 |
| GEODIS Logistics, LLC | 2 | $80,912 |
| Servesys Corporation | 1 | $85,000 |
| Synechron, Inc. | 1 | $74,585 |
| Tata Consultancy Services Limited | 1 | $75,587 |
| Tech Mahindra (americas), Inc | 1 | $124,000 |
Tiotalan dreuchd
- Infrastructure Consultant 26
- Consultant - Infrastructure Management - US4
- Senior Systems Administrator2
- Lead Administrator, IT Middleware1
- Senior Network Engineer (SERVLLGX0036)1
- Lead - Systems1
- Administrator, IT Middleware1
- Sr. Administrator, IT WCS Applications1
- System Administrator1
- IT Administrator - Systems II1
- Network Engineer1
- IT Engineer - Network II1
- Infrastructure Consultant 11
Luchd-taic H-1B ann an Brentwood, TN →
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).