Dàta Tuarastail H-1B

Dachaigh › Gnìomhan › Project Management Specialists › Cupertino, CA

Project Management Specialists ann an Cupertino, CA: Tuarastalan H-1B

48 iarrtasan cumhaichean-obrach airson an dreuchd seo le làrach-obrach ann an Cupertino, CA. Tuarastal bunasach meadhanach $160,389; leth meadhanach $141,800–$175,483.

Iarrtasan (LCAs)48
Tuarastal meadhanach a chaidh a thabhann$160,389
Leath mheadhanach nan tuarastalan$141,800–$175,483
Ceudail 10mh–90mh$114,250–$179,421

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre I (innte)$107,369
Ìre II (càileachail)$128,020
Ìre III (eòlach)$150,426
Ìre IV (gu lèir comasach)$179,171

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Apple Inc.32$160,600
Beezwax Datatools, Inc.2$115,998
Aac Technologies Irvine, Inc.2$150,322
Juniper Networks, Inc.2$179,421
Sunway Communication Inc.1$110,000
Falkonry, Inc.1$121,701
Thermo Fisher Scientific Inc.1$121,701
Osi Engineering, Inc.1—
Amphenol T&M Antennas, Inc.1$104,738
Cognizant Technology Solutions US Corp1$179,421
TVU Networks Corporation1$110,000
Eliassen Group, LLC1$131,040
Inspova, Inc.1$103,522
Natera, Inc.1$179,421

Tiotalan dreuchd

Luchd-taic H-1B ann an Cupertino, CA →

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).