Dachaigh › Tiotalan dreuchd › Engineering Team Lead
Engineering Team Lead: Tuarastalan H-1B
Chleachd 76 iarrtasan cumhaichean-obrach an tiotal dreuchd Engineering Team Lead. Tuarastal bunasach meadhanach $147,118; leth meadhanach $138,998–$163,582.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| M&T Bank | 20 | $143,666 |
| Cotiviti, Inc. | 7 | $138,906 |
| AvidXchange, Inc. | 6 | $160,513 |
| Vizient, Inc. | 6 | $155,643 |
| Citadel Enterprise Americas Services LLC | 3 | $250,000 |
| Citadel Americas Services LLC | 3 | $300,000 |
| Bastian Solutions LLC | 2 | $135,025 |
| CNH Industrial America LLC | 2 | $143,250 |
| Semperis Inc. | 2 | $123,126 |
| Texas Capital Bank | 2 | $170,000 |
| Caterpillar Inc. | 2 | $100,443 |
| Entrupy Inc. | 2 | $191,904 |
| TRC Solutions, Inc. | 2 | $166,516 |
| RingCentral, Inc. | 2 | $176,343 |
| Hyperdoc Inc | 2 | $222,500 |
| RecordPoint Software USA LLC | 1 | $122,325 |
| Linxup, LLC | 1 | $103,896 |
| Covr Financial Technologies, Inc. | 1 | $113,000 |
| Covr Technologies, LLC | 1 | $116,390 |
| Integrated Control Technologies LLC | 1 | $105,165 |
| Rosendin Electric Inc. | 1 | $131,685 |
| NLP Logix, LLC | 1 | $118,352 |
| Bloomberg L.P. | 1 | $182,957 |
| Braze, Inc. | 1 | $157,900 |
| Jdcq Solutions, LLC | 1 | $156,000 |
| CodeGreen Solutions LLC | 1 | $150,000 |
| Boku Inc. | 1 | $190,000 |
| Jarvis Products Corporation | 1 | $135,000 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $149,225 |
| Ìre II (càileachail) | $157,900 |
| Ìre III (eòlach) | $150,533 |
| Ìre IV (gu lèir comasach) | $147,118 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 15 | $132,430 |
| FY2024 | 17 | $143,666 |
| FY2025 | 25 | $149,247 |
| FY2026 | 18 | $147,118 |
Bailtean
- Buffalo, NY15
- New York, NY11
- Charlotte, NC6
- Wilmington, DE4
- Irving, TX4
- San Francisco, CA3
- Missouri City, TX2
- Addison, TX2
- Boise, ID2
- Richardson, TX2
- Mossville, IL2
- Duluth, GA2
- Apex, NC2
- Atlanta, GA1
- Bellevue, WA1
- Chesterfield, MO1
- Philadelphia, PA1
- Lilburn, GA1
- Coppell, TX1
- Kendall Park, NJ1
- Denver, CO1
- Oak Brook, IL1
- Belmont, CA1
- High Point, NC1
- Jacksonville, FL1
- Alpharetta, GA1
- Hoboken, NJ1
- Boca Raton, FL1
- Chicago, IL1
- Ste. 805, IL1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).