Dachaigh › Tiotalan dreuchd › Infrastructure Project Lead 1
Infrastructure Project Lead 1: Tuarastalan H-1B
Chleachd 111 iarrtasan cumhaichean-obrach an tiotal dreuchd Infrastructure Project Lead 1. Tuarastal bunasach meadhanach $84,198; leth meadhanach $80,616–$92,581.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Infosys Limited | 111 | $84,198 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre II (càileachail) | $84,198 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 40 | $86,018 |
| FY2026 | 70 | $84,198 |
Bailtean
- Houston, TX12
- Raleigh, NC9
- Richardson, TX6
- Duluth, GA4
- Portland, OR4
- Auburn Hills, MI4
- Denver, CO4
- Long Beach, CA3
- Phoenix, AZ2
- Chicago, IL2
- Coppell, TX2
- Fort Mill, SC2
- Folsom, CA2
- Louisville, KY2
- Omaha, NE2
- Malta, NY2
- Nashville, TN2
- Morrisville, NC2
- Tulsa, OK2
- Minneapolis, MN2
- Frisco, TX2
- West Valley, UT2
- Spring, TX2
- Milwaukee, WI2
- Detroit, MI2
- Indianapolis, IN2
- Bethpage, NY1
- East Peoria, IL1
- El Dorado Hills, CA1
- Sunnyvale, CA1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).