Dachaigh › Tiotalan dreuchd › Job Captain
Job Captain: Tuarastalan H-1B
Chleachd 100 iarrtasan cumhaichean-obrach an tiotal dreuchd Job Captain. Tuarastal bunasach meadhanach $85,000; leth meadhanach $77,486–$92,700.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| MBH Architects Inc. | 13 | $93,995 |
| M. Arthur Gensler Jr. & Associates, Inc. | 12 | $82,500 |
| HKS, Inc. | 11 | $82,000 |
| HLW International LLP | 6 | $95,500 |
| BSA Architects, Inc. | 4 | $90,500 |
| Curtain Wall Design & Consulting, Inc. | 3 | $77,314 |
| Fergus Garber Architects, Inc. | 2 | $88,982 |
| Carrier Johnson, Inc. | 2 | $84,500 |
| Scott Edwards Architecture LLP | 2 | — |
| Lundberg Architectural Design Corp. | 2 | $85,696 |
| BAR Architects & Interiors | 2 | — |
| Eigelberger LLC | 2 | $85,000 |
| Kevin Tsai Architecture Inc | 2 | $74,000 |
| RDC-S111, Inc. | 2 | $83,376 |
| Taylor & Associates Architects, Inc. | 2 | — |
| BDE Architecture, Inc. | 2 | $92,700 |
| Architects Orange, LLP d.b.a. AO | 1 | $64,480 |
| Studio G Architects, Inc. | 1 | $78,000 |
| Page Southerland Page, Inc. | 1 | $92,000 |
| Ross/Deckard Architects, P.A. | 1 | $73,000 |
| Ferguson Pape Baldwin Architects, Inc. | 1 | $68,078 |
| O'Donnell, Dannwolf & Partners Architects, Inc. | 1 | $75,000 |
| Dorman Associates, Inc. | 1 | $105,000 |
| HMC Group, Inc. | 1 | $94,159 |
| Arktura LLC | 1 | $72,100 |
| Phase X Engineering, Inc. | 1 | $90,000 |
| MBH Architects New York PC | 1 | $95,000 |
| Aufgang Architects LLC | 1 | $73,500 |
| Urban Architectural Initiatives, RA, P.C. | 1 | $71,000 |
| Landry Design Group Inc. | 1 | $69,992 |
| Carpenter Sellers Del Gatto Architects | 1 | $85,000 |
| Beri Varol Architectural Corporation | 1 | $68,000 |
| Delawie | 1 | $71,000 |
| Phillips Partnership, P.C. | 1 | $85,000 |
| HMC Group dba HMC Architects | 1 | $90,480 |
| AP & I Design, Inc. | 1 | $87,550 |
| CCS Architects | 1 | $74,000 |
| Tim Barber, Ltd. | 1 | $105,000 |
| Jones Haydu, Inc. | 1 | $79,768 |
| KTGY Group, Inc. | 1 | $79,768 |
| Dahlin Group, Inc. | 1 | — |
| Lewis Butler Architects | 1 | $109,554 |
| Mistry Design LLC | 1 | $70,000 |
| Architects Orange, LLP | 1 | $79,040 |
| MBH Architects New York P.C. | 1 | $94,000 |
| Scott Griffin Architects Ltd. | 1 | $75,920 |
| 19six Architects | 1 | $101,920 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $80,000 |
| Ìre II (càileachail) | $87,450 |
| Ìre III (eòlach) | $77,480 |
| Ìre IV (gu lèir comasach) | $90,000 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 17 | $75,005 |
| FY2024 | 20 | $83,500 |
| FY2025 | 30 | $85,000 |
| FY2026 | 23 | $93,995 |
Bailtean
- New York, NY14
- Alameda, CA13
- San Francisco, CA12
- Los Angeles, CA7
- Chicago, IL6
- San Diego, CA3
- Dallas, TX3
- Orange, CA2
- Palo Alto, CA2
- Washington, DC2
- Atlanta, GA2
- Raleigh, NC2
- Boston, MA2
- Portland, OR2
- Ontario, CA2
- Santa Monica, CA2
- Basalt, CO2
- San Jose, CA1
- Seattle, WA1
- Hollywood, FL1
- Mill Valley, CA1
- Carson, CA1
- Roseville, CA1
- Suffern, NY1
- Las Vegas, NV1
- San Dieggo, CA1
- Reston, VA1
- Huntersville, NC1
- Mountain View, CA1
- Wakefield, MA1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).