Dachaigh › Tiotalan dreuchd › Lead Administrator L1
Lead Administrator L1: Tuarastalan H-1B
Chleachd 182 iarrtasan cumhaichean-obrach an tiotal dreuchd Lead Administrator L1. Tuarastal bunasach meadhanach $81,931; leth meadhanach $79,123–$89,523.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Wipro Limited | 181 | $81,931 |
| Wipro VLSI Design Services, LLC | 1 | $110,282 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $80,933 |
| Ìre II (càileachail) | $81,931 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 48 | $79,123 |
| FY2024 | 39 | $80,080 |
| FY2025 | 45 | $81,931 |
| FY2026 | 48 | $89,523 |
Bailtean
- Irving, TX51
- O'Fallon, MO16
- Redmond, WA11
- Franklin, WI11
- Austin, TX7
- Westlake, TX4
- Milwaukee, WI4
- Houston, TX4
- Chicago, IL3
- Saint Paul, MN3
- Battle Creek, MI3
- Nashville, TN3
- Bellevue, WA3
- Columbus, OH2
- Cary, NC2
- Long Island City, NY2
- Phoenix, AZ2
- Eden Prairie, MN2
- North Quincy, MA2
- Morrisville, NC2
- Plano, TX2
- Addison, TX2
- Sunnyvale, CA2
- Inver Grove Heights, MN2
- Foster City, CA1
- Boise, ID1
- Allen, TX1
- Farmington Hills, MI1
- Mountain View, CA1
- Pittsburgh, PA1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).