Dachaigh › Tiotalan dreuchd › Lead Consultant - Infrastructure Management - US
Lead Consultant - Infrastructure Management - US: Tuarastalan H-1B
Chleachd 87 iarrtasan cumhaichean-obrach an tiotal dreuchd Lead Consultant - Infrastructure Management - US. Tuarastal bunasach meadhanach $95,867; leth meadhanach $92,284–$100,402.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Infosys Limited | 87 | $95,867 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre III (eòlach) | $95,867 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 47 | $93,995 |
| FY2024 | 23 | $96,158 |
| FY2025 | 16 | $100,912 |
Bailtean
- Raleigh, NC10
- Richardson, TX9
- Houston, TX6
- Bridgewater, NJ5
- Collegeville, PA4
- Nashville, TN3
- Tampa, FL3
- Sandy Springs, GA3
- Indianapolis, IN3
- Peapack, NJ2
- Greensboro, NC2
- Phoenix, AZ2
- West Valley, UT2
- Chicago, IL2
- Ridgeville, SC2
- Fort Mill, SC2
- Hershey, PA1
- Atlanta, GA1
- Rio Rancho, NM1
- Bentonville, AR1
- Folsom, CA1
- Long Beach, CA1
- El Dorado Hills, CA1
- Chandler, AZ1
- Westwood, MA1
- Rosemont, IL1
- San Antonio, TX1
- Milwaukee, WI1
- Blue Ash, OH1
- Santa Clara, CA1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).