Dachaigh › Tiotalan dreuchd › Project Engineer (Civil/Construction)
Project Engineer (Civil/Construction): Tuarastalan H-1B
Chleachd 80 iarrtasan cumhaichean-obrach an tiotal dreuchd Project Engineer (Civil/Construction). Tuarastal bunasach meadhanach $87,173; leth meadhanach $78,426–$96,138.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| DPR Construction, A General Partnership | 79 | $87,173 |
| Gregory P. Luth & Associates, Inc. | 1 | $83,533 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $70,000 |
| Ìre II (càileachail) | $87,173 |
| Ìre III (eòlach) | $99,070 |
| Ìre IV (gu lèir comasach) | $114,452 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 22 | $75,140 |
| FY2025 | 33 | $87,173 |
| FY2026 | 24 | $90,709 |
Bailtean
- Monroe, LA6
- Austin, TX5
- Redwood City, CA4
- Atlanta, GA4
- Reston, VA4
- East Brunswick, NJ4
- Burlington, TX4
- Charlotte, NC4
- Nashville, TN3
- Dallas, TX3
- Newport Beach, CA3
- Abilene, TX3
- Glen Allen, VA3
- Columbia, MD3
- San Antonio, TX2
- Fort Lauderdale, FL2
- San Diego, CA2
- Sacramento, CA2
- Phoenix, AZ2
- Trenton, SC2
- Durham, NC2
- Cheyenne, WY2
- Mableton, GA2
- Hartford, CT1
- Huntsville, AL1
- Greenville, SC1
- North Augusta, SC1
- Augusta, GA1
- Houston, TX1
- Tampa, FL1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).