Dachaigh › Tiotalan dreuchd › Project Engineer III
Project Engineer III: Tuarastalan H-1B
Chleachd 62 iarrtasan cumhaichean-obrach an tiotal dreuchd Project Engineer III. Tuarastal bunasach meadhanach $106,250; leth meadhanach $96,641–$121,840.
Luchd-fastaidh
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre I (innte) | $94,800 |
| Ìre II (càileachail) | $100,958 |
| Ìre III (eòlach) | $116,592 |
| Ìre IV (gu lèir comasach) | $113,785 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 12 | $105,207 |
| FY2024 | 16 | $115,500 |
| FY2025 | 17 | $103,230 |
| FY2026 | 14 | $98,891 |
Bailtean
- Southfield, MI5
- Fort Smith, AR5
- Rensselaer, NY4
- Anderson, SC3
- Houston, TX3
- Fairview, OR3
- Vidor, TX2
- Roswell, GA2
- Atlanta, GA2
- Chicago, IL2
- Montgomery, AL2
- Lenexa, KS2
- Parsippany, NJ1
- San Jose, CA1
- Sugar Land, TX1
- Menomonee Falls, WI1
- Phoenix, AZ1
- Mountain View, CA1
- Aliso Viejo, CA1
- Saline, MI1
- Albuquerque, NM1
- Dallas, TX1
- Oakland, CA1
- Renton, WA1
- Woodbridge, VA1
- Santa Clara, CA1
- Webster, TX1
- Lewisville, TX1
- Raleigh, NC1
- Wyomissing, PA1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).