Dachaigh › Tiotalan dreuchd › Project Engineer--Protection
Project Engineer--Protection: Tuarastalan H-1B
Chleachd 61 iarrtasan cumhaichean-obrach an tiotal dreuchd Project Engineer--Protection. Tuarastal bunasach meadhanach $116,901; leth meadhanach $101,750–$125,644.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| SEL Engineering Services, Inc. | 60 | $117,000 |
| Applied High Voltage, LLC | 1 | $101,858 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre II (càileachail) | $101,424 |
| Ìre III (eòlach) | $118,299 |
| Ìre IV (gu lèir comasach) | $138,829 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 23 | $116,802 |
| FY2024 | 15 | $117,000 |
| FY2025 | 15 | $116,605 |
| FY2026 | 7 | $118,099 |
Bailtean
- Houston, TX12
- Irvine, CA8
- Fairview Heights, IL7
- Plymouth, MI7
- Pullman, WA6
- Alpharetta, GA4
- Vacaville, CA3
- Phoenix, AZ3
- Charlotte, NC2
- King of Prussia, PA2
- Boise, ID2
- Frederick, MD1
- Irvine, TX1
- Lakewood, CO1
- Lewis Center, OH1
- Plano, TX1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).