Dàta Tuarastail H-1B

Dachaigh › Tiotalan dreuchd › Project Manager 3

Project Manager 3: Tuarastalan H-1B

Chleachd 326 iarrtasan cumhaichean-obrach an tiotal dreuchd Project Manager 3. Tuarastal bunasach meadhanach $129,340; leth meadhanach $107,563–$139,948.

Iarrtasan (LCAs)326
Tuarastal meadhanach a chaidh a thabhann$129,340
Leath mheadhanach nan tuarastalan$107,563–$139,948
Ceudail 10mh–90mh$93,912–$150,928

Laghiche in-imrich, neach-faighinn no neach-fastaidh? Seall do sheirbheis aig mullach na duilleige seo — $99 airson 30 latha →

Luchd-fastaidh

Neach-obrachLCAsTuarastal meadhanach
Capgemini America Inc323$129,799
S3cloudsolutions LLC2$121,514
TAI Engineers, LLC1$85,613

A rèir ìre tuarastail

Ìre tuarastailTuarastal meadhanach
Ìre II (càileachail)$85,613
Ìre III (eòlach)$129,537

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY202389$94,619
FY202493$130,000
FY202582$136,706
FY202658$130,464

Bailtean

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).