Dachaigh › Tiotalan dreuchd › Sr. Implementation Consultant
Sr. Implementation Consultant: Tuarastalan H-1B
Chleachd 44 iarrtasan cumhaichean-obrach an tiotal dreuchd Sr. Implementation Consultant. Tuarastal bunasach meadhanach $111,365; leth meadhanach $104,416–$120,276.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Edifecs, Inc. | 17 | $111,365 |
| Cotiviti, Inc. | 15 | $120,276 |
| OM Partners USA, Inc. | 4 | $95,000 |
| Hexagon Manufacturing Intelligence, Inc. | 4 | $97,986 |
| Altera Digital Health Inc. | 2 | $105,580 |
| Etq, LLC | 1 | $103,293 |
| BillingPlatform Corp. | 1 | $137,813 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre II (càileachail) | $96,776 |
| Ìre III (eòlach) | $109,600 |
| Ìre IV (gu lèir comasach) | $122,429 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 9 | $103,293 |
| FY2024 | 14 | $109,600 |
| FY2025 | 10 | $115,820 |
| FY2026 | 9 | $117,000 |
Bailtean
- Atlanta, GA18
- Tucson, AZ3
- Bellevue, WA3
- Windsor Locks, CT2
- Seattle, WA2
- Farmingdale, NY2
- Dacula, GA2
- Sandy Springs, GA1
- St. Augustine, FL1
- Prosper, TX1
- Saint Cloud, FL1
- Tampa, FL1
- Englewood, CO1
- Frisco, TX1
- Dunwoody, GA1
- Austin, TX1
- Celina, TX1
- Hapeville, GA1
- Chandler, AZ1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).