Dachaigh › Tiotalan dreuchd › Staff SW Engineer
Staff SW Engineer: Tuarastalan H-1B
Chleachd 442 iarrtasan cumhaichean-obrach an tiotal dreuchd Staff SW Engineer. Tuarastal bunasach meadhanach $139,464; leth meadhanach $130,686–$154,094.
Luchd-fastaidh
| Neach-obrach | LCAs | Tuarastal meadhanach |
|---|---|---|
| Visa Technology & Operations LLC | 205 | $139,152 |
| Visa U.S.A. Inc. | 137 | $138,252 |
| CyberSource Corporation | 89 | $140,167 |
| NCR Corporation | 4 | $147,006 |
| Digital First Holdings LLC (D/B/A Candescent) | 4 | $165,705 |
| NCR Voyix Corporation | 3 | $150,041 |
A rèir ìre tuarastail
| Ìre tuarastail | Tuarastal meadhanach |
|---|---|
| Ìre II (càileachail) | $131,600 |
| Ìre III (eòlach) | $134,077 |
| Ìre IV (gu lèir comasach) | $139,464 |
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 102 | $132,683 |
| FY2024 | 106 | $139,464 |
| FY2025 | 151 | $141,751 |
| FY2026 | 80 | $144,903 |
Bailtean
- Austin, TX201
- Foster City, CA109
- Highlands Ranch, CO58
- Bellevue, WA29
- Atlanta, GA27
- Ashburn, VA7
- San Ramon, CA2
- Westlake Village, CA1
- Redwood City, CA1
- Palo Alto, CA1
- Los Angeles, CA1
- Mentor, OH1
- Fremont, CA1
- Union City, CA1
- Lehi, UT1
- Sunnyvale, CA1
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).